This Final SMMP was developed using a collaborative approach with Zone 7 staff, staff from other agencies in the Valley, and representatives from regional stakeholder groups. The stakeholders involved provided input through a series of workshops and meetings held between September 2002 and March 2005, as outlined in Table ES-1. Through these workshops, the stakeholders and Zone 7 staff worked together to provide input on goals and objectives for the SMMP, stream management needs and opportunities, and recommended projects for the SMMP Program.
Note: Some of the files are large; please allow ample time to download.
- Cover, Title Page, Table of Contents, List of Abbreviations [2.0 mb]
- Executive Summary [2.9 mb]
- Section 1 Background [2.5 mb]
- Section 2 Goals and Objectives [56 kb]
- Section 3 Needs and Opportunities [4.1 mb]
- Section 4 Region Storage at Chain of Lakes [3.1 mb]
- Section 5a SMMP Program and Project Descriptions [328 kb]
- Section 5b SMMP Program and Project Descriptions [15.2 mb]
- Section 6 Implementation Strategies [176 kb]
- Appendix A References [32 kb]
- Appendix B Previous Studies [76 kb]
- Appendix C Sediment Analysis [4.4 mb]
- Appendix D Hydraulic Analysis [918 kb]
- Appendix E Frequency of Storage [364 kb]
- Appendix F Flow Scenarios [1.3 mb]
- Appendix G SMMP Cost Estimate [213 kb]
- Appendix H1 Types of Policies to Be Developed with SMMP Implementation [40 kb]
- Appendix H2 Permitting Requirements Associated with SMMP Implementation [48 kb]
- Appendix H3 Public Outreach [36 kb]


